Mercury Marine’s Plant 4 needed to add several machining centers to improve productivity while utilizing the same building footprint.
Rohde also included an on-site nitrogen generation system to blanket our die-cast process which saved us money from the start”
~David Hahn, Project Manager, Mercury Marine.
The Rohde Customized Solution:
-
Design, fabrication and installation of HVAC in the machine centers area of the plant 17 expansion.
-
Design and installation of on-site nitrogen gas generators for the die-cast facitility. Lowering costs substantially compared to storage, handling and processing of liquid nitrogen.
-
Floor sweep HVAC to contribute to higher air quality in the die cast facility as well as machine centers area.
-
Variable speed makeup air and exhaust fans added as needed for the expansion.
-
Custom PLC for monitoring and control of the HVAC, nitrogen, and process piping.
-
Installation of make up air units to supply fresh filtered air back into the facility